Construction Progress: Jan through Mar 2025

Jan– Mar 2025

Summary of significant progress includes:

  • Mechanical, Electrical and Plumbing rough-in with the needed modifications got completed, inspected, and passed 
  • Grease trap got installed and inspected 
  • Propane gas pipes re-routed to combine the two tanks 
  • Network CAT6 cables installed 
  • Pre drywall inspection passed; insulation for sound reduction; drywall installation started 